Swimming Pool Update

Penguin Palace Pool Upgrades Scheduled to Finish On Time:

  1. All materials are on site for the remainder of the work to be completed.
  2. Electrical scope in engineering stage is wrapping up this week. All electrical installation will begin March 29.
  3. Structural engineers are working away finalizing the approvals for the new deck and coating.
  4. New 4″ drain to pump line has been installed.
  5. New membrane installation is 90% complete.